Clean Air Permitting: Status of Implementation and Issues

Clean Air Permitting:
Status of Implementation and Issues
Updated November 17, 2008
Claudia Copeland
Specialist in Resources and Environmental Policy
Resources, Science, and Industry Division



Clean Air Permitting:
Status of Implementation and Issues
Summary
The 1990 Clean Air Act amendments require major industrial sources of air
pollutants to obtain federal operating permits. These permits, authorized in Title V
of the act, are intended to enhance environmental compliance by detailing for each
covered facility all of the emission control requirements to which it is subject. Title
V also was intended to generate permit fees that would be used by state and local
permitting authorities for administering the program. Implementation of these
requirements affects nearly 17,000 industrial sources of air emissions, as well as state
and local air pollution control agencies. Adding these provisions to the act was
controversial, and implementation, too, has generated controversies.
The Environmental Protection Agency (EPA) issued Title V regulations in 1992.
Aspects of those rules (particularly concerning procedures to modify permits) have
been contentious since then. EPA has considered a number of regulatory revisions,
but has not finalized any modifications. However, EPA has issued white papers and
a number of formal and informal guidance documents that, together with the 1992
rules, comprise the agency’s current interpretation of statutory and regulatory
requirements.
Because of regulatory and program approval delays, state and local agencies
were slow to begin issuing Title V permits, falling far short of statutory deadlines and
EPA’s goals. As of March 2000, for example, less than 45% of all required Title V
permits had been issued. According to an EPA Inspector General report, key factors
that delayed issuance of permits included insufficient state resources, complex EPA
rules and limited guidance, and conflicting state priorities. According to EPA, as of
January 2008, 99% of all required original permits had been issued, and permit
reissuance (required after five years) and modification have replaced issuance of
initial permits as the major ongoing task of permitting agencies.
Eighteen years after Congress enacted Title V, the program has reached some
maturity, and most stakeholders agree that at least some of the benefits identified by
Congress have been achieved, such as incorporation of applicable air pollution
control requirements in a single document that is accessible to regulators, the public,
and industrial sources. At the same time, there also is widespread dissatisfaction
with the program’s complexity, costs, and confusing requirements. Many believe
that a lack of EPA guidance has contributed greatly to implementation problems.
Congressional examination of Title V has been limited since its enactment to several
oversight hearings, the most recent of which was in 2000.



Contents
In troduction ..................................................1
Major Features of the Operating Permits Program....................1
EPA Regulations..............................................3
Status of the Permit Program and Permit Issuance....................4
Issues .......................................................6
Complexity and Cost.......................................7
Confusing Requirements and Limited EPA Guidance.............9
Congressional Interest.........................................11



Clean Air Permitting: Status of
Implementation and Issues
Introduction
A key element of the 1990 Clean Air Act (CAA) amendments (P.L. 101-549;
42 U.S.C. §§7661-7661f) was the comprehensive permit program established in Title
V of the act. It was added to the CAA to enhance compliance by detailing for each
covered facility all the emission control requirements to which the facility is subject.
Previously, an industrial source’s pollution control obligations — ranging from
emission controls and monitoring requirements to recordkeeping and reporting
requirements — were scattered throughout numerous, often hard-to-find provisions
of state plans or various federal regulations. While approximately 35 states or
localities had operating permit programs before 1990, they varied considerably, and
few were as comprehensive as the new Title V program. Adding these provisions to
the CAA was controversial, and implementation, too, has generated controversies.
Congress’ intent in creating the operating permits program was to “(1) better
enforce the requirements of the law by applying them more clearly to individual
sources and allowing better tracking of compliance, and (2) provide an expedited
process for implementing new control requirements.” Benefits of the air permit
program were expected to include clarification of pollution control requirements,
simplification of procedures for modifying a source’s control obligations, augmenting
state resources through permit fees, and enhancing states’ ability to administer other
significant new CAA responsibilities, such as the air toxics and acid deposition1
programs.
This report describes the statutory background of the Title V program and the
status of implementation, in terms of federal approval of state and local permitting
authorities and permit issuance. It also discusses broad policy issues identified by
various stakeholders, including program complexity and costs, and inconsistencies
due to a lack of sufficient federal guidance.
Major Features of the Operating Permits Program
Prior to the 1990 amendments, this law required individual federal permits only
for construction of new or modified industrial sources of air pollutants. Existing
sources did not have to obtain permits unless they were subsequently modified and
increased their air emissions. Title V, which was modeled after a similar program
in the Clean Water Act, expanded the number of sources requiring federal permits


1 U.S. Congress, Senate, Committee on Environment and Public Works, “Clean Air Act
Amendments of 1989, report to accompany S. 1630,” S.Rept. 101-228, 101st Congress, 1st
session, pp. 346-348.

by stipulating that all major pollution sources and other designated sources must
obtain operating permits which permitting agencies will use to ensure compliance
with the CAA.
Operating permits are now an important tool in the overall compliance and
enforcement aspects of the CAA, because permits contain the plans and schedules
for sources to reach attainment with provisions of the act, plus emission limitations
and monitoring requirements. Further, they are enforceable, meaning that EPA,
states, or citizens may take action to require a source to achieve compliance with the
terms of its permit.
The Environmental Protection Agency (EPA) estimates that nearly 17,000
industrial sources are subject to Title V. These specifically include major sources,
defined as stationary facilities that emit or have the potential to emit 100 tons or more
per year of any regulated pollutant or combination of pollutants, and sources subject
to the act’s acid rain provisions. Title V also covers:
!sources in nonattainment areas2 that emit as little as 10 tons per year
of volatile organic compounds (VOCs), depending on the region’s
nonattainment status;
!sources subject to New Source Performance Standards (NSPS)3;
!regulated sources of air toxics emissions (any source that emits more
than 10 tons per year of an individual hazardous pollutant or more
than 25 tons per year of any combination); and
!sources required to have new source or modification permits under
Title I of the act.
Permits compile in a single document all of the enforceable emission limitations and
standards, plus inspection, monitoring, compliance certification, and reporting
requirements for the source, but they are not intended to change or alter the existing,
underlying requirements or add any substantive requirements. They are issued for
five-year periods and must be renewed thereafter.
Title V is intended to be primarily a state-run program. It provides two
incentives in this regard: (1) permitting agencies are able to use permit fees collected
from sources to run their permit programs, and (2) EPA will implement a federal
operating program, if a state fails to do so. In many cases, states delegate to local
programs the responsibility for implementing the operating permits programs. For
example, 34 local authorities implement the permit program in California, rather than


2 Nonattainment areas are regions that have failed to attain and maintain one or more
National Ambient Air Quality Standard (NAAQS). EPA has promulgated NAAQS for six
air pollutants: sulfur dioxide, particulate matter, nitrogen dioxide, carbon monoxide, ozone,
and lead. For background information, see CRS Report RL30853, Clean Air Act: A
Summary of the Act and Its Major Requirements, coordinated by James E. McCarthy.
3 New Source Performance Standards establish nationally uniform, technology-based
maximum emission levels for categories of new major stationary sources, such as
powerplants, steel mills, etc. The goal is to force the installation of new pollution control
technology and thus prevent new pollution problems.

a single state agency. In other locations (for example, Tennessee, Arizona,
Washington, and Idaho), local authorities implement the program in parts of a state,
and the state regulatory agency has responsibility in the rest of the state.
Permitting agencies are required to collect permit fees sufficient to cover the
cost of the permit program, and the fees may be used only for administering the
program. The act requires that the fee schedule be set so as to collect from all
sources, in the aggregate, not less than $25 per ton of each regulated pollutant to
cover all reasonable (direct and indirect) costs of administering the program.4
Regulated pollutants include VOCs, National Ambient Air Quality Standard
pollutants except carbon monoxide, and pollutants regulated under the hazardous air
pollutant and NSPS provisions of the act.
EPA Regulations
EPA issued regulations to implement the permit program requirements in July
1992 (40 C.F.R. Part 70), seven months after the statutory deadline. The Part 70
rules cover the minimum elements of state permit programs. Rules promulgated in
February 1999 (40 C.F.R. Part 71) cover federal permitting on Indian reservations
and in any state that fails to adopt or implement an approvable Title V program.
While state and local agencies primarily implement the Title V program, the
CAA provides for EPA oversight of permitting programs and gives EPA the right to
review permit applications and object to proposed Title V permits. Defining the
parameters of this oversight has been a source of tension among EPA, states, and
industry. One over-arching issue has been the question of developing permits with
sufficient flexibility to allow for the fact that industrial sources often change their
operations (thus affecting air emissions) in response to marketplace signals, and they
want to be able to do so quickly without needing a revised permit for every such
change. The public also has an important role in the permitting process, because
citizens may submit comments and request a hearing on draft permits. Further, under
CAA Section 505(b), any person may petition EPA to object to issuance of a permit,
and Section 502(b)(6) requires that there be an opportunity for judicial review in state
court of final permit actions by the applicant, persons who participated in the public
comment process, and any other person who could obtain judicial review of such
actions under state laws.
The 1992 regulations were challenged by environmentalists, states, and industry,
mostly over details concerning permit revisions. In response, in August 1994, EPA
proposed modifications intended to address some of the biggest issues. Those
proposed changes were not widely accepted by states and industry, however, and
EPA took additional steps to streamline the permit programs. Since 1994, EPA has
worked with states, industry, and environmentalists to reach consensus on key issues


4 The fee amount considered sufficient to fund all permit program costs (sometimes called
the “presumptive minimum”) has been adjusted for inflation by EPA over the years. The
current presumptive minimum amount (in effect through August 31, 2009) is $43.75 per ton
of regulated pollutant. States are not required to adopt the presumptive minimum fee rate.

and has issued and re-drafted several regulatory proposals but has not finalized
modifications to Part 70. Thus, the 1992 rules remain in effect.
The focus of efforts to revise the rules has been on how to streamline aspects of
the regulations concerning permit modifications and revisions. According to EPA
officials, the 1992 regulations give states ample flexibility to write permits that allow
for minor operational changes by industry and to process permit modifications. Still,
efforts to revise those rules have been driven by concerns of many permitting
authorities and industrial sources that the current rules do not allow sufficient
flexibility. One issue that has been particularly contentious concerns the procedures
and amount of public review required for relatively minor modifications at emissions
sources. At issue have been the definition and criteria for facility changes that are
neither so minor that little or no review will be required, nor clearly so
environmentally significant that full EPA review and public comment will be
appropriate. EPA continued internal and external discussions on revising the Part 70
rules for some time, but by early 2005, agency officials apparently had ceased these
activities. However, these efforts may be revived, as EPA considers and responds
to recommendations for improvements to the permit program made in 2006 by a Title
V Task Implementation Force (discussed below).
During the lengthy consideration of possible Part 70 rule changes, EPA issued
guidance in the form of white papers to address some implementation issues that had
been raised, such as permit revisions, EPA’s role in reviewing permits, administrative
complexity, etc. The first was issued in July 1995 (concerning streamlining to reduce
costs and paperwork), and the second in March 1996 (concerning overlapping federal
and state requirements). A third white paper, concerning options for operational
flexibility, was drafted in mid-2000, but was criticized by environmentalists and
some state officials and was not issued. In addition, EPA has issued some formal
guidance on specific implementation issues.
Status of the Permit Program and Permit Issuance
Under the CAA, all states and territories were to submit operating permit
programs by November 15, 1993. Once a state or locality’s program was approved
(EPA had one year to review the application), major industrial sources had 12 months
to submit permit applications to the state or local authority, and permitting agencies
had three years to issue permits to applicants.
As of June 1997, EPA had approved permit programs for all 114 submissions
by states, local agencies, and territories. EPA gave full approval to some, but the
majority (99 programs) were interim approvals, meaning that the program
substantially, but not fully, met the requirements of the CAA and EPA regulations.
The law allows EPA to grant interim approval for two years, during which time the
permitting agency must correct deficiencies but can otherwise operate the program
and issue permits. At the end of two years, the interim program must be replaced by
a fully approved program; otherwise, EPA must implement a federal permitting
program for the state or locality.
Despite the language of the statute, EPA administratively granted extensions of
the interim program approvals on four occasions between 1995 and 2000 and did not



implement a federal program. During this time, the agency was considering changes
to the Part 70 rules and argued that it would be most efficient to allow permitting
authorities to combine program revisions with those required by whatever new Part
70 rules might be issued. Without extension, interim authority would expire, and
EPA would be required to take over the program — a situation not viewed as
desirable by EPA or states. In May 2000, EPA issued a final extension until
December 1, 2001, for 86 operating permit programs that still lacked full approval,
stating that no further extensions would be approved. But environmental groups,
which had criticized the multiple extensions, challenged this action, seeking to
strengthen permit programs and to force EPA to take over deficient state and local
programs, as the CAA requires. To settle this lawsuit, EPA modified its regulations
to clarify that a federal permitting program would apply in any area without a fully
approved program as of December 1, 2001. When that deadline arrived, EPA gave
final approval to all but a few of the 86 state and local programs that still had interim
approval. In one case, Connecticut, outstanding issues were soon resolved, and EPA
granted full approval in May 2002. In a second case, Maryland, further action by the
legislature was required to resolve remaining problems. EPA gave final program
approval there in January 2003. EPA took over these programs in December 2001,
but it delegated permitting responsibility to the states and did not actually issue any
permits in the interim, while federal approval was pending.
At the same time that it announced settlement of the lawsuit (December 2000),
EPA also announced a 90-day period for public comment on program and/or
implementation deficiencies of operating programs, regardless of approval status.
Ultimately, after reviewing comments on a number of individual state and local
programs, EPA issued notices of deficiency (NODs) to eight states, 34 local air
permitting authorities in California, and the District of Columbia, directing them to
correct regulatory program deficiencies within 18 months, as the CAA requires.
Separately, EPA obtained commitment letters from nearly two dozen state and local
permitting authorities that agreed to address certain actions relating to
implementation issues identified by EPA (i.e., less significant than regulatory issues
for programs that received NODs). According to EPA, the identified NOD issues
have been resolved with all state and local agencies (in one case, involving Hawaii,
the deficiency was corrected, but EPA has not yet published a Federal Register
Notice to that effect). In May 2005, EPA issued a NOD to Maricopa County, AZ, for
deficiencies related to permit fees and permit processing; this NOD has not yet been
resolved. Environmentalists believe that EPA acted improperly in allowing programs
to operate despite deficiencies, but they were unsuccessful in lawsuits challenging a
number of the EPA program approvals.
In part because of the regulatory and program approval delays, state and local
agencies were slow to begin issuing Title V permits. In early 1998, EPA surveyed
states and EPA regions and found that only about 2,100 permits had been issued as
of December 1997, compared with an estimated 11,000 that should have been issued.
In March 1999, EPA proposed an ambitious goal of resolving the permit backlog by
the end of 2000. Permit issuance increased, but it continued to fall far short of the
statutory deadlines and EPA’s goals. As of March 2000, 42% of all required Title
V permits had been issued; as of March 2001, 57% had been issued. While there
were consequences for permitting authorities that did not get program approval by
EPA (i.e., the possibility of federal takeover, as discussed above), there were no real



consequences or penalties for industrial sources that did not receive Title V permits
due to state and local agencies’ delays. The principal consequence was a delay in
attaining the policy objectives intended by Congress when it established the Title V
program.
An EPA Inspector General (IG) report, issued in March 2002, criticized EPA
and state and local agencies over the program’s continuing problems. The IG noted
that, as of December 31, 2001, 30% of required permits had not been issued, and only
four state and 17 local agencies had issued all of their Title V permits. Key factors
delaying the issuance of permits included insufficient state resources, complex EPA
regulations and limited guidance, and conflicting state priorities, the IG reported.5
A consequence of those delays is that the benefits that Congress intended the permit
program to achieve have not been realized, according to the IG’s analysis. According
to EPA, as of January 2008 — 12 years after the first program approvals — 99% of
all original permits required for 16,726 Title V sources had been issued. After that
initial process, the ongoing task of permit reissuance (required after five years) and
modification has become the focus of most permitting authorities’ attention.
Nationally, every year there are about 100 new sources required to obtain initial
permits and about 3,000 sources required to obtain renewal permits.
Issues
Eighteen years after Congress enacted Title V, the program has reached some
maturity, and most stakeholders agree that at least some of the objectives and benefits
identified by Congress have been achieved:
!Incorporating applicable requirements in one document that
consolidates duplicative and redundant requirements is beneficial to
regulatory agencies, the public, and regulated sources.
!Establishment of a funding mechanism provides resources to state
and local permit programs.
!Source compliance assurance systems — driven by improved
understanding of compliance requirements, obligations on corporate
officials to certify compliance and report deviations, and a
strengthened penalty/enforcement mechanism — have improved.
!Public participation has improved at various stages of the permitting
process.
At the same time, there also is widespread dissatisfaction with the program as
it exists today, due to program complexity; confusion and uncertainty about some of
its requirements; and criticism of costs to regulated entities, permit agencies, and
even the general public. While many believe that the permit program has clarified
requirements and fostered consistency and fairness in regulatory treatment of sources,
others argue otherwise, saying that permits suffer from excessive length and
increased complexity. Benefits are more likely to be observed in states and localities


5 U.S. Environmental Protection Agency, Office of the Inspector General, “Evaluation
Report: EPA and State Progress in Issuing Title V Permits,” Report No. 2002-P-00008,
March 29, 2002, pp. 8-14.

that had no operating permit program prior to Title V and to be questioned more
vigorously where such a program previously did exist. Likewise, views are mixed
on whether the Title V program has resulted in air quality and health benefits.
Arguably, this was not an objective, because Title V is an administrative program and
was not intended to have a direct impact on emissions. Permitting agencies,
however, say that many major sources have voluntarily restricted their operating
conditions or installed pollution controls in order to reduce emissions below the Title
V regulatory thresholds (thus becoming what is often referred to as “synthetic
minors;” see discussion on page 9), which is a plus for the environment.
Critiques of the Title V program are reflected in a March 2005 report of the EPA
Inspector General6 and in a 2006 report by a Task Force on Title V Implementation
Experience that was convened by EPA’s Clean Air Act Advisory Committee. The
Task Force, consisting of state and local permitting agency, industry, and
environmental advocacy group representatives, developed an extensive list of
recommendations for improving the program which it believed could be implemented
under current legislative and regulatory authority.7
Complexity and Cost. Prior to establishment of the Title V program, major
sources of air pollution were not required to have federally enforceable operating
permits. Regulatory requirements for these sources typically derive from multiple
provisions of the CAA and were often scattered among multiple documents, thus
complicating efforts to determine compliance and to provide effective enforcement
of the law. Consolidating existing requirements (some dating from the 1970s) into
a single, comprehensive document, while undoubtedly beneficial, also has resulted
in permits that are lengthy and detailed, making it difficult to read them without
precise knowledge of the individual source’s operations, according to some
stakeholders.
Many issues have arisen, including what level of detail must be incorporated in
a Title V permit (versus streamlining or simplifying the permit), how should small
and insignificant emissions sources be treated, and how will newly issued CAA
requirements such as hazardous air pollutant standards be incorporated. Another
issue is the extent to which permitting agencies can adapt or update a source’s
existing requirements (particularly those that were established many years earlier) so
as to reflect its current operating conditions, without resulting in changes that exceed
the scope of Title V, since the permit program was intended to consolidate but not
substantively alter regulatory requirements. Title V was not intended to affect the
stringency of requirements incorporated into a permit, but stakeholders disagree on
whether actions such as the addition of new monitoring or new compliance methods
affect stringency or are sometimes tantamount to creating new substantive
requirements.


6 U.S. Environmental Protection Agency, Office of the Inspector General, “Substantial
Changes Needed in Implementation and Oversight of Title V Permits If Program Goals Are
to Be Fully Realized,” Report No. 2005-P-00010, 109 p.
7 The Title V Task Force, “Final Report to the Clean Air Act Advisory Committee on the
Title V Implementation Experience,” April 2006, available at [http://www.epa.gov/air/
caaac/titlev.html ].

From the beginning of the program, a key concern for EPA, states, regulated
industries, and environmental advocacy groups has been the issue of operational
flexibility in operating permits, the concept of allowing for operational change at a
facility, while assuring compliance with applicable requirements and ensuring
environmental protection. EPA addressed the issue in the 1992 Part 70 regulations
and subsequent guidance (especially a 2000 draft White Paper). Also, beginning in
1993, EPA sponsored a flexible permitting pilot program with industrial facilities in
13 states in an effort to evaluate opportunities to design air permits to accommodate
operational flexibility. EPA evaluated the economic and administrative benefits of
flexible permits and documented several environmental performance benefits
(including emissions reductions). Based on its assessment of the pilots, in September
2007, EPA proposed a rule to formalize certain permitting flexibility in the Title V
rules.8 EPA officials expect to promulgate a final rule by November 2008.
Industry groups generally believe that the regulatory burden and costs of the
Title V program outweigh the benefits and far exceed EPA’s estimate at the time the
Part 70 rules were adopted of $15,000 average cost per facility annually. In addition
to permit applications, facilities incur recurring costs related to staffing, permit
changes/corrections, report preparation, legal reviews, and management reviews of
compliance. Also, some stakeholders (environmental advocates, for example) argue
that program cost is not a significant issue when viewed in the context of cost as a
percentage of a company’s operating cost, and that companies often benefit from the
additional information gained through the program.
Costs are a continuing concern for state and local regulatory authorities with
regard to increasing paperwork requirements and the sufficiency of current permit
fees. Having adequate resources to administer federal environmental programs is
always an issue for states and localities, especially in light of increasing program
demands. The Title V permit fee requirement was intended to address that, by
ensuring that sufficient resources would be provided. EPA has not conducted a
comprehensive audit of permitting agency resources, but available information (such
as the 2002 EPA Inspector General’s report) suggests that a number of states
(perhaps many) are not collecting sufficient fees to cover their costs, which
contributes to problems in hiring staff and processing permits.
In March 2007, an environmental advocacy group, the Environmental Integrity
Project, released a report which concluded that more than half of the states have fee
structures that do not meet federal minimum standards. The report focused on 18
states in which fees fell below the federal minimum, either because the states set
lower emission fees or set a ceiling on the amount that could be collected from each
polluter that was lower than the federal presumptive minimum on at least the first
4,000 tons of emissions of each pollutant covered by a Title V permit. It estimated
that these 18 states are undercharging regulated sources by at least $53 million less
than is required by the federal minimum standard. The report found that, if states
were to raise fees to at least the minimum federal amount, they could provide a


8 U.S. Environmental Protection Agency, “Operating Permit Programs and Prevention of
Significant Deterioration (PSD) and Nonattainment New Source Review (NSR); Flexible
Air Permitting Rule,” 72 Federal Register no. 176, September 12, 2007, pp. 52205-52261.

significant source of funding to support their air quality management programs, but
that additional funding (for example, from EPA CAA grants) also is needed. It
recommended that EPA undertake a comprehensive evaluation to ensure that low
emission fees are not weakening the CAA permit program or its enforcement.9
One factor affecting fee revenues is the large number of sources that have
lawfully opted out of the Title V program. EPA originally estimated that about
37,000 facilities nationwide would be subject to Title V. Today, the universe of Title
V sources is nearly 17,000, and the others — often termed “synthetic minors” —
have installed pollution control equipment or taken other steps to ensure that their
emissions are below the Title V threshold of what is a major source. For permitting
agencies, the resource issue is two-fold. First, most agencies initially calculated fee
amounts and revenues based on a larger number of sources, but actual revenues have
been less, since more than one-half of sources have lawfully avoided Title V
coverage. Second, these sources still represent a regulatory workload, in terms of
non-Title V permitting (separate state requirements) and tracking, which is unlikely
to be covered fully by other fee revenues or available funding. Getting state
legislatures to approve fee increases to address these concerns is politically difficult,
in most cases.
Confusing Requirements and Limited EPA Guidance. Critiques of the
Title V program, including the EPA Inspector General’s reports and the Title V Task
Force report, identify insufficient EPA guidance as a major implementation issue.
The IG’s 2005 report, based on a review of permits issued by several states, found
that permit clarity varies widely from state to state. Permit requirements are often
vaguely stated or identified by reference to other documents, without narrative
description or precise citation. EPA regulations require that the permitting authority
prepare a statement for each draft permit to set forth the legal and factual basis of the
permit, but the IG found that such statements often are inadequate or totally missing.
From its review, the IG concluded that many of these problems stem from a lack
of EPA guidance on key issues, which results in permitting inconsistencies and
contributes to permitting delays that adversely affect sources, agencies, and the
public. The IG strongly recommended that EPA issue nationwide guidance on a
number of topics (including requirements for the statement of basis in permits,
requirements for content of annual compliance certifications by corporate officials,
and applicability of sanctions for unresolved program deficiencies) in order to
achieve more national cohesion and consistency in Title V permits.
EPA has issued very limited formal guidance and rules on Title V in the past
several years. In lieu of formal guidance, EPA has relied on responses to citizen
petitions and letters to regions and permitting authorities to convey its position on
key Title V issues, arguing that this strategy allows for flexibility that reflects
differences in source complexity.10 Some stakeholders are concerned that, rather than
resolving program issues through rulemaking or nationally applicable interpretive


9 Environmental Integrity Project, “Shortchanging the Clean Air Act: An Analysis of State
Revenues Lost Due to Low Emission Fees,” March 2007.
10 EPA Inspector General Report No. 2005-P-00010, pp. 84-85.

guidance, EPA is using the petition process and other mechanisms not just to apply
law to facts, but to make law in the first instance. The change away from issuing
national rules or guidance occurred following a federal court decision which vacated
a 1998 EPA guidance document on periodic monitoring. In that case, the court ruled
that the agency had exceeded its authority by utilizing non-binding guidance rather
than national rulemaking to interpret regulatory requirements (Appalachian Power
Co. v. EPA, 208 F.3d 1015 (D.C. Cir. 2000)). The IG noted that permitting
authorities may be unwilling to follow or be unaware of guidance that isn’t national
in scope.
One example of the issue of lack of EPA guidance relates to incorporation of
monitoring requirements in permits, one of the most contentious issues in Title V
implementation. The CAA mandates that permits include monitoring and reporting
requirements to assure compliance with permit terms and conditions. In the 1992
Part 70 rules, EPA required that permits include all monitoring and test methods
detailed in the applicable underlying requirements (e.g., in NSPS or hazardous air
pollutant standards incorporated in the Title V permit). In addition, where an
underlying applicable requirement does not require “periodic monitoring,” Part 70
requires that periodic monitoring be specified in the Title V permit.
The 2005 EPA IG report found that specification of monitoring requirements
was one of the most significant areas of inconsistency in permits and that a number
of stakeholders and EPA regional officials contend that more EPA guidance on these
issues is needed. The Title V monitoring rules, and specifically the application of
“periodic monitoring” requirements in permits, have been subject to several EPA
interpretations (the most recent is a December 2006 interpretive rule)11 and to
litigation challenging those interpretations, in cases asking the court to determine the
meaning of the periodic monitoring rule and related regulatory language and to
determine the consistency of the rules (as interpreted by EPA) with the statutory
requirements. In August 2008, a federal appeals court vacated the 2006 rule as
inconsistent with the Clean Air Act.12 According to the 2006 Title V Task Force
report, stakeholders fundamentally disagree on the statutory and regulatory
requirements and particularly on whether permitting authorities may or must
(depending on one’s perspective) specify new or revised emissions monitoring
requirements in permits.13 The 2006 rule, which the appeals court struck down in
2008, had said that (contrary to prior policy) state and local authorities could not
require supplemental monitoring in cases where existing monitoring is inadequate to
ensure compliance with the Clean Air Act.


11 U.S. Environmental Protection Agency, “Final Rule Interpreting the Scope of Certain
Monitoring Requirements for State and Federal Operating Permits Programs,” 71 Federal
Register no. 241, December 15, 2006, pp. 75422-75431 In addition to this rule, EPA has
committed to take several actions to improve monitoring, including issuing periodic
monitoring guidance, and issuing an advanced notice of proposed rulemaking (ANPR)
seeking public comment on monitoring inadequacies in state implementation plans and
federal regulations. This ANPR was published February 16, 2005; see 70 Federal Register

7905. New periodic monitoring guidance has not been issued.


12 Sierra Club v. EPA, No. 04-1243 (DC Cir, August 19, 2008).
13 Title V Task Force Final Report, pp. 47-63.

Congressional Interest
As the Task Force noted, much about Title V remains unsettled and subject to
debate in both the legal and policy arenas, and it urged that steps be taken to “stem
the tide of transaction costs and to bring an increased level of certainty and stability
to implementation of this program.”14 Responding to the Task Force report in
September 2006, EPA officials identified a number of priorities and next steps. Over
the next one to two years, the agency will work with states to identify best practices
such as standards for granting a public hearing, providing written responses to public
comments, and coordination of Title I and Title V process. Over the next one to
three years, EPA will review existing guidance and issue new guidance as
appropriate concerning clarification of the permit revision process and permit
reopening, and clarification of certain statements required in draft permits. Finally,
EPA will initiate rulemakings to address several concerns, such as clarifying when
insignificant activities are exempt from permits, and allowing alternatives to
newspapers for public notice requirements. Rulemakings could take three years or
more, EPA said. Other priorities include improving online notice and access to
documents, and improving the EPA petitions website.15
In January 2008, EPA officials reportedly told an industry group that the agency
is working on a proposed rule and guidance document, in partial response to the Task
Force report. The streamlining proposal and guidance are expected to address a
number of issues — but only a small percentage of the Task Force’s
recommendations — including the type of emission units that must be included in
a permit, the effectiveness of the public notice process, and the complexity and length
of the permits. The proposed rule, which is expected to be proposed early in 2009,
also is expected to remove insignificant emission units from the Title V permit
process, allow the use of online public notices instead of newspaper notices, and
clarify the use of administrative amendments and minor permit revisions.
Congressional oversight of the Title V program has been limited to hearings by
a House Energy and Commerce subcommittee and a Senate Environment and Public
Works subcommittee in mid-1995, and a Senate Environment subcommittee field
hearing in 2000 that addressed Title V and other CAA issues. So far, Congress has
not considered statutory changes that would affect the Title V requirements. These
issues could draw greater congressional scrutiny in the future.


14 Title V Task Force Final Report, pp. 8-9.
15 “EPA’s Response to the Title V Task Force Recommendations,” presentation to the Clean
Air Act Advisory Committee, September 14, 2006. EPA’s database of petitions filed to
object to the issuance of a Title V permit is available at [http://www.epa.gov/region07/
programs/artd/air/title5/petitiondb/petitiondb.htm] .